Arista C-Z100-Z100-2M Compatible 100G SFP-DD 2 x 50G PAM4 Passive Copper Twinax Cable, 2m (7ft)

For project documentation, Arista C-Z100-Z100-2M and this cable’s physical length should be recorded together. The product described here is a 2m (7ft) DAC assembly for 100G links, using SFP-DD to SFP-DD. Its OEM cross-reference, HT part number, specification table and packing options support traceable ordering and installation records.
OEM Part Number: C-Z100-Z100-2MHT Part Number: C-Z100-Z100-2M
Product Highlights
- Compatible alternative to Arista C-Z100-Z100-2M
- 100G connectivity at 100Gbps
- Interface configuration: SFP-DD to SFP-DD
- Fixed length and part number: 2m (7ft), C-Z100-Z100-2M
- Cable construction: Passive Twinax
- Conductor specification: 28AWG
- Maximum power consumption: 0.1W
- Minimum bend radius: 25.2mm
Specifications
| HT Part Number | C-Z100-Z100-2M |
|---|---|
| Arista Compatible | C-Z100-Z100-2M |
| Manufacturer | HT |
| Form Factor | SFP-DD to SFP-DD |
| Max. Data Rate | 100Gbps |
| Media | Copper |
| Cable Type | Passive Twinax |
| Cable Length | 2m (7ft) |
| Jacket Material | PVC (OFNR) |
| Minimum Bend Radius | 25.2mm |
| Wire AWG | 28AWG |
| Max. Power Consumption | 0.1W |
| Modulation Format | 2x 50G-PAM4 |
| Commercial Temperature Range | 0 to 70°C (32 to 158°F) |
| Application | 100G Ethernet, 128G Fibre Channel |
| Protocols | SFP-DD MSA, SFP-DD MIS, IEEE 802.3cd |
Signal and Lane Configuration
The listed modulation format is 2x 50G-PAM4. Both host interfaces must be configured for the same aggregate rate and lane arrangement. A connector that fits mechanically does not by itself guarantee that the remote port supports this encoding or breakout mode.
Power and Thermal Planning
The rated power consumption is 0.1W. Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.
Cable Construction and Routing
This assembly uses 28AWG conductors, PVC (OFNR) jacket, minimum bend radius 25.2mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.
Network and Protocol Considerations
The intended application is 100G Ethernet, 128G Fibre Channel. Listed interface and protocol references include SFP-DD MSA, SFP-DD MIS, IEEE 802.3cd. Confirm that the host firmware and port configuration support the same operating mode.
Passive Copper Operation
A passive DAC has no separate optical conversion stage. Its low-power, low-latency operation is useful for short equipment links, but the assembly must remain within the length and signaling mode accepted by both hosts.
Length Selection and Installation Planning
C-Z100-Z100-2M provides 2m (7ft) for connections between separated rack units or nearby equipment positions. Plan the route around cable managers and power cords, keeping the assembly free from connector strain while avoiding a large obstruction in the airflow path.
Position Within the Length Range
C-Z100-Z100-2M occupies the middle of this family between C-Z100-Z100-1M at 1m (3ft) and C-Z100-Z100-3M at 3m (10ft). It adds 1m over the shorter option for extra routing clearance, while the next longer version adds another 1m. Measure the managed path and choose this version when its reach is sufficient without creating the slack associated with the longer assembly.
Project Documentation and Cable Identification
Large deployments are easier to audit when the order code, physical length and endpoint record agree. Keep the OEM reference in the compatibility document and use the HT part number on the packing list. Where several lengths arrive together, labels and carton groups can be arranged by rack or port plan so installers do not have to identify cables by appearance alone. For this assembly, the listed conductor specification is 28AWG; the minimum bend radius is 25.2mm; the stated power consumption is 0.1W; the jacket material is PVC (OFNR).
Arista Compatibility and Factory Testing
Factory verification links the compatibility identity to the exact physical assembly described on this page. Identification, connector condition and live link behavior are checked before packing. Customers can submit equipment and firmware details with the project documentation for a more specific pre-order compatibility review. Both connectors are examined before the operating test, which includes link stability and diagnostic indications.
Frequently Asked Questions
Is this an original Arista cable?
No. It is an HT-manufactured compatible alternative for equipment that specifies Arista C-Z100-Z100-2M.
Are separate transceivers or patch leads required?
No. This is one complete direct-attach assembly. The ends are not detachable modules and should not be separated from the cable.
Can excess cable be folded into a compact bundle?
No. Use a supported, bend-safe service loop and observe the listed minimum bend radius. Do not crease the cable or tighten ties around the connector boots.
Will any matching connector operate at the same speed?
Not necessarily. Both hosts must support the stated rate, identification, lane mapping and any required breakout configuration; mechanical compatibility alone is insufficient.
Ordering Information
Use the listed HT part number for ordering and retain the OEM reference as the host-compatibility cross-reference. Send quantities by length, along with any rack-based packing or label instructions. If the project has mixed equipment, include the host model for each group rather than relying only on the aggregate cable rate. Keep C-Z100-Z100-2M associated with 2m (7ft) throughout the order and receiving record.
Shipping and Lead Time
Available stock is generally dispatched within one to three working days after order confirmation, with production lead times advised for larger quantities. Delivery can be arranged by courier, air freight or sea freight, and goods may instead be handed to an appointed forwarder or shipped on the customer’s courier account.
Quality Assurance and Packaging
Inspection and link testing are completed before the cable enters its protective packaging. Project orders can be packed and labelled by length, rack or customer reference, with packing documentation that makes received quantities straightforward to reconcile against the installation schedule. Standard protective packing is used by default, with project documentation arranged when requested.
