SFP-DD to SFP-DD-100G-AOC-1M3FT 100G SFP-DD 2 x 50G PAM4 Active Optical Cable, 1m (3ft)

This SFP-DD to SFP-DD-100G-AOC-1M3FT compatible cable gives project teams a defined 100G connection in 1m (3ft), with SFP-DD to SFP-DD and Generic host compatibility. Rather than treating all lengths as interchangeable, the page keeps this order code separate and links the other verified lengths for accurate schedules, labels and delivery checks.
OEM Part Number: SFP-DD to SFP-DD-100G-AOC-1M3FTHT Part Number: SFP-DD to SFP-DD-100G-AOC-1M3FT
Product Highlights
- HT-manufactured AOC assembly in 1m (3ft)
- 100G connectivity at 100Gbps
- Interface configuration: SFP-DD to SFP-DD
- Fixed length and part number: 1m (3ft), SFP-DD to SFP-DD-100G-AOC-1M3FT
- Cable construction: OM4
- Maximum power consumption: ≤3.5W
- Minimum bend radius: 60mm
Specifications
| HT Part Number | SFP-DD to SFP-DD-100G-AOC-1M3FT |
|---|---|
| Manufacturer | HT |
| Connector Type | SFP-DD to SFP-DD |
| Max Data Rate | 100Gbps |
| Cable Length | 1m (3ft) |
| Cable Type | OM4 |
| Wavelength | 850nm |
| Minimum Bend Radius | 60mm |
| Transmitter Type | VSCEL |
| Receiver Type | PIN |
| Power Consumption | ≤3.5W |
| Power supply | 3.5V |
| CDR (Clock and Data Recovery) | TX & RX Built-in CDR |
| Modulation Format | 2x 50G-PAM4 to 2x 50G-PAM4 |
| DDM/DOM | Supported |
| Commercial Temperature | 0 to 70°C (32 to 158°F) |
| Protocols | SFP-DD MSA, SFP-DD MIS |
Signal and Lane Configuration
The listed modulation format is 2x 50G-PAM4 to 2x 50G-PAM4. Both host interfaces must be configured for the same aggregate rate and lane arrangement. A connector that fits mechanically does not by itself guarantee that the remote port supports this encoding or breakout mode.
Position Within the Length Range
SFP-DD to SFP-DD-100G-AOC-1M3FT is the shortest of 12 verified length options in this family. It is the preferred choice when the port positions are close and cable slack must be kept to a minimum. The next option is SFP-DD to SFP-DD-100G-AOC-2M7FT at 2m (7ft), adding 1m for a less direct routing path; selecting it unnecessarily would leave more cable to dress.
Project Documentation and Cable Identification
Large deployments are easier to audit when the order code, physical length and endpoint record agree. Keep the OEM reference in the compatibility document and use the HT part number on the packing list. Where several lengths arrive together, labels and carton groups can be arranged by rack or port plan so installers do not have to identify cables by appearance alone. For this assembly, the minimum bend radius is 60mm; the stated power consumption is ≤3.5W.
Power and Thermal Planning
The rated power consumption is ≤3.5W. Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.
Cable Construction and Routing
This assembly uses minimum bend radius 60mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.
Network and Protocol Considerations
The intended application is determined by the host interface and protocol support. Listed interface and protocol references include SFP-DD MSA, SFP-DD MIS. Confirm that the host firmware and port configuration support the same operating mode.
Integrated Optical Assembly
The optical engines and fiber are permanently integrated into this AOC. There are no detachable optical modules to clean or exchange. Handle the complete assembly by its connector housings and cable, and keep both ends matched to the same interface specification.
Length Selection and Installation Planning
At 1m (3ft), SFP-DD to SFP-DD-100G-AOC-1M3FT is a practical choice for direct connections within one rack. Route the cable along the intended management path rather than pulling it diagonally across adjacent connectors, and leave enough clearance for insertion, removal and front-panel airflow.
Generic Compatibility and Factory Testing
Factory verification links the compatibility identity to the exact physical assembly described on this page. Identification, connector condition and live link behavior are checked before packing. Customers can submit equipment and firmware details with the project documentation for a more specific pre-order compatibility review. Both connectors are examined before the operating test, which includes receive activity and diagnostic indications.
Frequently Asked Questions
Is this an original equipment manufacturer cable?
No. It is manufactured by HT under our own manufacturer identity.
Will any matching connector operate at the same speed?
Not necessarily. Both hosts must support the stated rate, identification, lane mapping and any required breakout configuration; mechanical compatibility alone is insufficient.
What details assist a compatibility review?
Provide the equipment manufacturer, model, port type, hardware revision and software release, together with the OEM reference, required length and quantity.
How should an unused assembly be stored?
Protect both connector ends, keep the cable in a loose bend-safe coil and retain its part-number label so the length and compatibility identity remain traceable.
Ordering Information
Use the listed HT part number for ordering and retain the OEM reference as the host-compatibility cross-reference. Send quantities by length, along with any rack-based packing or label instructions. If the project has mixed equipment, include the host model for each group rather than relying only on the aggregate cable rate. This page’s fixed configuration is 1m (3ft); another length must be quoted under its corresponding part number.
Shipping and Lead Time
Standard configurations normally ship within one to three working days, while production quantities are confirmed with the order. Delivery can be arranged by courier, air freight or sea freight, and goods may instead be handed to an appointed forwarder or shipped on the customer’s courier account.
Quality Assurance and Packaging
Inspection and link testing are completed before the cable enters its protective packaging. Project orders can be packed and labelled by length, rack or customer reference, with packing documentation that makes received quantities straightforward to reconcile against the installation schedule. Neutral packaging and customer-specific packing documentation are available on request.
