SFP112 to SFP112-100G-DAC-2M7FT 100G SFP112 PAM4 Passive Copper Twinax Cable, 2m (7ft)

This SFP112 to SFP112-100G-DAC-2M7FT compatible cable gives project teams a defined 100G connection in 2m (7ft), with SFP112 to SFP112 and Generic host compatibility. Rather than treating all lengths as interchangeable, the page keeps this order code separate and links the other verified lengths for accurate schedules, labels and delivery checks.
OEM Part Number: SFP112 to SFP112-100G-DAC-2M7FTHT Part Number: SFP112 to SFP112-100G-DAC-2M7FT
Product Highlights
- HT-manufactured DAC assembly in 2m (7ft)
- 100G connectivity at 100Gbps
- Interface configuration: SFP112 to SFP112
- Fixed length and part number: 2m (7ft), SFP112 to SFP112-100G-DAC-2M7FT
- Cable construction: Passive Twinax
- Conductor specification: 26AWG
- Maximum power consumption: <0.15W
- Minimum bend radius: 25mm
Specifications
| HT Part Number | SFP112 to SFP112-100G-DAC-2M7FT |
|---|---|
| Manufacturer | HT |
| Connector Type | SFP112 to SFP112 |
| Max Data Rate | 100Gbps |
| Minimum Bend Radius | 25mm |
| Wire AWG | 26AWG |
| Cable Length | 2m (7ft) |
| Jacket Material | PVC (OFNR) |
| Cable Type | Passive Twinax |
| Compatible | Generic |
| Power Consumption | <0.15W |
| Power Supply | 3.3V |
| Temperature | 0 to 70°C (32 to 158°F) |
| Application | 100G Ethernet |
| Modulation Format | 100G-PAM4 to 100G-PAM4 |
| Protocol | CMIS Rev5.0, SFF-8024 |
Signal and Lane Configuration
The listed modulation format is 100G-PAM4 to 100G-PAM4. Both host interfaces must be configured for the same aggregate rate and lane arrangement. A connector that fits mechanically does not by itself guarantee that the remote port supports this encoding or breakout mode.
Length Selection and Installation Planning
SFP112 to SFP112-100G-DAC-2M7FT provides 2m (7ft) for connections between separated rack units or nearby equipment positions. Plan the route around cable managers and power cords, keeping the assembly free from connector strain while avoiding a large obstruction in the airflow path.
Position Within the Length Range
SFP112 to SFP112-100G-DAC-2M7FT occupies the middle of this family between SFP112 to SFP112-100G-DAC-1.5M5FT at 1.5m (5ft) and SFP112 to SFP112-100G-DAC-2.5M8FT at 2.5m (8ft). It adds 0.5m over the shorter option for extra routing clearance, while the next longer version adds another 0.5m. Measure the managed path and choose this version when its reach is sufficient without creating the slack associated with the longer assembly.
Project Documentation and Cable Identification
Large deployments are easier to audit when the order code, physical length and endpoint record agree. Keep the OEM reference in the compatibility document and use the HT part number on the packing list. Where several lengths arrive together, labels and carton groups can be arranged by rack or port plan so installers do not have to identify cables by appearance alone. For this assembly, the listed conductor specification is 26AWG; the minimum bend radius is 25mm; the stated power consumption is <0.15W; the jacket material is PVC (OFNR).
Power and Thermal Planning
The rated power consumption is <0.15W. Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.
Cable Construction and Routing
This assembly uses 26AWG conductors, PVC (OFNR) jacket, minimum bend radius 25mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.
Network and Protocol Considerations
The intended application is 100G Ethernet.
Passive Copper Operation
A passive DAC has no separate optical conversion stage. Its low-power, low-latency operation is useful for short equipment links, but the assembly must remain within the length and signaling mode accepted by both hosts.
Generic Compatibility and Factory Testing
Factory verification links the compatibility identity to the exact physical assembly described on this page. Identification, connector condition and live link behavior are checked before packing. Customers can submit equipment and firmware details with the project documentation for a more specific pre-order compatibility review. Where supported by the host, link stability and diagnostic indications are reviewed together with the established link.
Frequently Asked Questions
Is this an original equipment manufacturer cable?
No. It is manufactured by HT under our own manufacturer identity.
Can excess cable be folded into a compact bundle?
No. Use a supported, bend-safe service loop and observe the listed minimum bend radius. Do not crease the cable or tighten ties around the connector boots.
Will any matching connector operate at the same speed?
Not necessarily. Both hosts must support the stated rate, identification, lane mapping and any required breakout configuration; mechanical compatibility alone is insufficient.
What details assist a compatibility review?
Provide the equipment manufacturer, model, port type, hardware revision and software release, together with the OEM reference, required length and quantity.
Ordering Information
Use the listed HT part number for ordering and retain the OEM reference as the host-compatibility cross-reference. Send quantities by length, along with any rack-based packing or label instructions. If the project has mixed equipment, include the host model for each group rather than relying only on the aggregate cable rate. Quantity and any labeling instructions should be attached specifically to SFP112 to SFP112-100G-DAC-2M7FT.
Shipping and Lead Time
Available stock is generally dispatched within one to three working days after order confirmation, with production lead times advised for larger quantities. International express, air cargo and sea freight can be selected according to destination and carton volume; customer courier accounts and nominated forwarders are also accepted.
Quality Assurance and Packaging
Inspection and link testing are completed before the cable enters its protective packaging. Project orders can be packed and labelled by length, rack or customer reference, with packing documentation that makes received quantities straightforward to reconcile against the installation schedule. Volume orders can include customer references on the labels and carton list.
